Mar 28, 2024  
2017-2018 CATALOG 
    
2017-2018 CATALOG [ARCHIVED CATALOG]

Add to Portfolio (opens a new window)

NUCL 2730 - Plant Operating Procedures 1

(3)
This course involves the study of selected nuclear plant abnormal operating procedures (AOPs) and their application during transient conditions. These procedures provide responses to various instrumentation and control failures, loss of power events, steam or feedwater system breaks, steam generator tube leaks, and the loss of safety related cooling water systems. Prereq(s): NUCL 2620, 2621, 2622, and 2623. (Su) Note(s): NUCL 2620, 2621, 2622, and 2623 or departmental approval.


Click here for Fall course scheduling information.




Add to Portfolio (opens a new window)